Thickness: 50mm
Width: 400mm, 600mm, 1200mm
Length: 3m, 5m
Density: 80kg/m3, 100kg/m3, 128kg/m3...
Facing: Fiberglass cloth, Aluminum Foil...
Welcome inquiry now !
The construction processes of Mineral wool with aluminum foil generally includes the following steps:
Substrate treatment: Make sure the construction surface is flat, dry and free of impurities such as dust and oil.
Measurement and cutting: according to the actual need, measure the size of Mineral wool board and aluminum foil, and cut them to ensure a close fit.
Stick the aluminum foil: Paste the aluminum foil on the surface of the Mineral wool board, make sure the aluminum foil is flat and free of air bubbles.
Installation of Mineral wool boards: Install the Mineral wool boards with aluminum foil pasted to the predetermined position, which can be pasted, anchored or other suitable installation methods.
Sealing treatment: Seal the edges and joints of the Mineral wool boards to prevent heat dissipation and water vapor penetration.
Inspection and acceptance: after the construction is completed, carry out inspection to ensure that the installation quality of Mineral wool board with aluminum foil meets the requirements.
In the construction process, the following points need to be noted:
Choose suitable Mineral wool board and aluminum foil materials to ensure that their quality and performance meet the requirements.
The construction environment should meet the requirements, avoiding construction in humid or low temperature conditions.
Construction personnel should have relevant construction experience and skills to ensure construction quality.
Carry out the construction in accordance with the construction process and specifications to ensure the safety and reliability of the construction.
Mineral wool roll with aluminum foil mostly used in some of the higher requirements for temperature and humidity control of clean workshops, cold storage and other places, but also often see its application, both to ensure temperature stability and moisture vapor barrier.